Cube compressive strength
We carry out concrete cube strength testing at 7 and 28 days, or at the ages your specification sets, including 56 days for slower-gaining basement and piling mixes. Every cube is tested against its casting date.
Hixtra · concrete cube testing in London
Concrete cube compressive strength testing for London sites: basements, frames, piles and podium slabs. Cubes made on your site come to our laboratory up the M1, are cured under controlled conditions and are crushed at the ages your specification sets.
Talk to Hixtra →020 7993 5733Cube testing is scheduled against your casting dates. Call to arrange delivery, courier or collection from London.

Concrete specimens tested against an agreed method and reporting scope.
Quality, safety & professional standards
UKAS accreditation applies to the tests listed in our accredited schedule. Ask us for the current scope before you book.
Understand our accreditation →



Built for rolling programmes
Weekly pours, several ages and several elements. Every cube is tracked by reference from arrival to report.
Cured under control
Cubes stay in a controlled curing tank at the laboratory until the day they are crushed.
Reported on the day
Results go to the people you name as soon as each cube is tested.
Concrete cube testing in London
London pours more structural concrete than anywhere else in the country, much of it on tight sites with piling, basement boxes and a frame going up a floor at a time. With that many pours, cube results only help if each one is tied to the right element and can be trusted.
We carry out concrete cube strength testing at 7 and 28 days, or at the ages your specification sets, including 56 days for slower-gaining basement and piling mixes. Every cube is tested against its casting date.
Concrete core testing gives the in-place strength of a slab, wall, column or pile cap where cube results are missing, low or disputed. We cut cores on London sites and prepare and test them at the laboratory.
Our curing service keeps cubes in water at a controlled temperature until the test day, so nothing depends on a bucket in the corner of a site cabin. Hardened concrete density testing can be added on the same cubes.
Most of London is outside the distance at which our technicians attend pours. The outer north-west boroughs are borderline, so ask. Elsewhere, cubes are made by your team or your supplier, sampled to BS EN 12350-1 and made to BS EN 12390-2. Space is tight on London sites, so agree in advance where cubes will stand for their first day: level, covered, protected from sun, frost and knocks, and away from plant vibration. After 16 hours and within 3 days, demould, mark each cube with a unique reference, keep them wet and send them by courier, deliver them up the M1, or ask us to collect during a site visit.

Questions people ask
Practical answers for planning and booking concrete cube testing in London.
Ask us about your project →Mostly not. Fresh concrete testing, meaning slump, flow and cube making at the pour, is only offered within about an hour’s drive of our laboratory in Milton Keynes. That excludes central, east and south London. The outer north-west boroughs, around Barnet, Harrow and Hillingdon, are borderline, so send the postcode and we will confirm. Elsewhere your team or your supplier makes the cubes and we test them.
By courier, by your own delivery up the M1 to Milton Keynes, or by collection when we are on your site for plate bearing or other testing, if you tell us when you book. Wrap cubes damp, pack them so they cannot knock together and send them to arrive before the first test age. On a rolling programme, a regular weekly courier run works well.
Yes. Give us the pour programme and the required ages. Each set of cubes is booked in by reference when it arrives, scheduled against its casting date and reported as soon as it is crushed. What makes it work is a consistent reference from your side: level, pour number and element. That is the detail most often missing when a result has to be traced months later.
It affects what should be specified. London Clay commonly carries sulfates, so piles, basements and other buried concrete are designed to a sulfate class from the ground investigation and the mix is chosen to suit, often with a high proportion of GGBS. A cube test confirms compressive strength, not sulfate resistance, so check every delivery ticket against the specified mix.
Not necessarily. Mixes with a lot of GGBS or fly ash, common in London basements and piles, gain more of their strength after 7 days than a CEM I mix does, so an early result looks low by comparison. A 7-day result is an early indicator, not a verdict. Conformity is judged at the age your specification sets, normally 28 days and sometimes 56.
The cube is loaded to failure in a calibrated compression machine, and the strength is the maximum load divided by the cross-sectional area, reported in newtons per square millimetre. Testing is usually specified to BS EN 12390-3. The report gives the reference, age at test, dimensions, failure load, strength and whether the failure pattern was satisfactory.
Check the specimen first. Identification, age at test, curing history, dimensions and failure pattern can all explain a low figure. If the result stands, the next move is your engineer’s, commonly a spare cube at a later age or cores from the element to establish the in-place strength. We cut cores on London sites, so both can stay with the same laboratory.
No. A cube is compacted and cured under standard conditions and shows what the concrete as supplied can achieve. Concrete in a column, wall or slab is placed and cured in place and is normally somewhat weaker. Cube results judge the conformity of the supply, and in-place strength is assessed from cores.
Your specification sets the sampling rate, usually by reference to BS 8500 and BS EN 206, depending on the volume and importance of the pour. A set from each sample covering the specified ages, plus a spare, is common. Make every cube in a set from the same sample and tell us which are spares to hold.
Somewhere level, sheltered and still. A fresh cube is sensitive to temperature, drying and vibration for its first day. Keep the moulds covered, out of direct sun and frost, at around 20 °C if you can, and away from piling rigs, hoists and traffic routes. Leave them at least 16 hours and no more than 3 days before demoulding, then keep them wet until they travel.
Hixtra holds UKAS accreditation to ISO/IEC 17025 under schedule number 8996. Accreditation is granted method by method, not to the company as a whole. Most of our soil and aggregate tests are on the schedule, and some concrete tests are still going through the accreditation process. If your specification or your client’s engineer requires accredited cube results, tell us when you enquire and we will confirm whether that method is on the current schedule before you book.
A unique reference marked on each cube and a schedule that matches it: site, level and element, supplier and mix reference, casting date and time, testing ages and who receives the results. Add slump or flow if it was measured. With several contractors and pours on one London site, the reference is what keeps results attached to the right concrete.
No. There is no Hixtra laboratory or office in London. The 020 number rings through to the laboratory in Milton Keynes, where every cube is cured and crushed. Milton Keynes is straight up the M1, so a same-day courier or your own delivery is simple to arrange.
Keep reading
In our customers’ words
Independent feedback from the people we work with.
“Punctual, friendly and professional.”Read the full review →
“Perfect service and explained everything step by step.”Read the full review →
“Excellent service! Incredibly professional. Thankyou”Read the full review →