CBR testing in Winchester.

In-situ and laboratory CBR testing for Winchester sites, on chalk, Clay-with-Flints and the soft ground of the Itchen valley. On chalk the timing of the test matters as much as the method, and we help you get both right.

Talk to Hixtra →01962 461501

Same-day and next-day dates are often available for Winchester, with site results normally reported the same day. Call to check availability.

In-situ CBR testing rig set up beneath a vehicle on hardstanding

Quality, safety & professional standards

Expertise you can check.

UKAS accreditation applies to the tests listed in our accredited schedule. Ask us for the current scope before you book.

Understand our accreditation →
UKAS testing · 8996
CHAS accredited contractor
SSIP scheme assessed
AGS member

We know chalk

When it was exposed, what has run over it and whether it has rained all change the number. We ask before we test.

Method matched to spec

In-situ, soaked laboratory and derived CBR answer different questions. We help you book the right one.

Reported the same day

Site CBR results are normally sent the same day as a PDF for your engineer.

CBR testing in Winchester

CBR testing on chalk: method and timing.

Around Winchester, CBR testing is mostly for estate roads and highway works on the housing sites along the M3 and A34 and on the downland around the city. Nearly all of it is on chalk or on the clay that caps it. Three different tests can produce a CBR value, and on chalk the choice, and the day you choose to test, both matter.

01 / IN-SITU

In-situ CBR

The plunger test at formation level, from our vehicle. On chalk it needs care: a plunger that lands on a flint gives a false high or refuses, so we log it and reposition. Test soon after the formation is exposed. Explore in-situ CBR testing →

02 / LABORATORY

Laboratory CBR

A bulk sample is remoulded at the laboratory and tested, soaked where the design needs it. Remoulding breaks down the chalk structure, so laboratory values on chalk need reading with that in mind. Explore laboratory CBR testing →

03 / DERIVED

Plate bearing & derived CBR

On intact chalk, flinty ground, capping and Type 1, a plate bearing test loads a larger area and is less troubled by flints. A derived CBR is reported where the specification allows it, labelled as derived. Explore plate bearing testing →

What Winchester chalk does to a CBR result.

LWD testing and DCP testing both have limits on chalk, and it helps to know them. Winchester sits where the Itchen cuts through the Hampshire Downs. On the valley sides and the higher ground, at Kings Worthy, Harestock, Badger Farm and Winnall, chalk is close to the surface. Intact and freshly exposed, it is stiff and gives high values. Worked wet or over-trafficked, it breaks down to putty chalk, the formation is lost and the CBR collapses with it, so the result depends on how the formation was treated before we arrived. Flint bands give false highs and refusals under a plunger or a DCP cone. Clay-with-Flints caps much of the downland and behaves as a clay, so a road can run from chalk to clay and back within a few hundred metres. Through the centre and the water meadows the Itchen floodplain is alluvium, peat and tufa with shallow groundwater, where a CBR is very low and the road is designed over it.

Hixtra vans and staff lined up outside
Hixtra project photography.

Questions people ask

Your questions, answered.

Practical answers for planning and booking CBR testing in Winchester.

Ask us about your project →
How quickly can you carry out CBR testing in Winchester?

Same-day and next-day dates are often available, subject to the schedule. We never guarantee an attendance time, but Winchester is a reasonable run from our laboratory in Milton Keynes down the A34 and M3, so dates are usually easier to find here than in the far south west or the north. On chalk, speed matters. Ring 01962 461501 before the formation is trimmed, not after it has stood open for a week.

Why does the timing of a CBR test on chalk matter so much?

Because chalk changes once it is exposed. Freshly cut and dry, intact chalk gives a high CBR. After rain, frost or repeated trafficking the surface degrades to putty chalk, and the same formation can return a fraction of the value. We ask when it was exposed, whether it has rained since and what has run over it. Test soon after exposure, then cover the formation promptly.

What do flints do to a CBR result?

They spoil it. A CBR plunger is only 50 mm across, so if it seats on a flint the reading is far too high, or the test refuses altogether. We log those positions and move a short distance to retest. On very flinty chalk, or on Clay-with-Flints with a lot of stone, a plate bearing test loads a much larger area and gives a more representative answer.

What CBR should I expect on Clay-with-Flints?

Treat it as a clay. Clay-with-Flints caps much of the higher ground around Winchester in variable thickness. It is moisture sensitive, gives much lower values than the chalk beneath it, and softens quickly when wet. A scheme can cross from chalk to clay and back in a few hundred metres, so make sure each material is tested and do not apply the chalk value to the clay lengths.

Can you test CBR in the Itchen valley and the water meadows?

We can, but the natural ground there is alluvium, peat and tufa with groundwater at shallow depth, and the CBR is very low. Roads and hardstandings on the valley floor are designed over that ground on a granular layer, and the useful tests are plate bearing and density on the layer. Tell us what the designer has asked for and we will match the testing to it.

Which CBR method does my specification need?

Send us the clause. Adoptable estate roads normally need an in-situ CBR at formation level. On chalk, some designers prefer plate bearing with a derived CBR, because flints trouble the plunger less. A laboratory CBR on remoulded chalk reads lower than the intact formation, so check what your engineer wants. The report should always say which method produced the number.

Is a laboratory CBR on chalk a fair test?

It is a conservative one. To prepare the specimen the chalk is broken down and recompacted into a 152 mm mould, which destroys the natural structure that gives intact chalk its strength. That is appropriate where the chalk will be excavated and placed as fill, and pessimistic for an undisturbed formation. Testing is commonly carried out to BS 1377-2. Tell us which case applies and we will advise.

How many CBR tests does an estate road need?

The specification or the adopting highway authority sets the number. Where they are silent, it depends on the length of road and how many times it crosses from chalk to clay cover or into a dry valley, where looser head and chalk wash collect. Positions are spread so that the weaker lengths are found. In-situ testing is commonly carried out in accordance with BS 1377-9.

Does a CBR test find solution features in the chalk?

No. Where clay cover sits on chalk, water can dissolve pipes and hollows beneath it, and they can be metres deep. A CBR plunger stresses only the top of the formation and will not find them. That is a question for the ground investigation and the designer. CBR testing describes the surface the road will be built on.

What do you need on site for an in-situ CBR test?

The test level exposed and trimmed flat, safe vehicle access to each position and a clear working area. The equipment is vehicle mounted and reacts against the weight of the vehicle, so steep downland gradients and very soft valley ground can rule a position out. Keep traffic off the formation before we arrive. The plunger hole is backfilled before we leave.

Is your CBR testing UKAS accredited?

Hixtra holds UKAS accreditation to ISO/IEC 17025 under schedule number 8996. Accreditation is granted method by method, not to the company as a whole, so it applies only to the tests listed on our current schedule. Most of our soil tests are on it. If your specification or the adopting authority requires an accredited result, name the CBR method when you enquire and we will confirm whether it is on the schedule before you book.

What does CBR testing in Winchester cost?

Every visit is quoted from the site postcode. The price depends mainly on the number of positions and the time on site. Repeat visits are what push the cost up on chalk, usually because the formation was not ready or had degraded before we arrived, so book with a firm date. We can often combine a Winchester visit with work in Southampton, Eastleigh or Basingstoke.

Do you have an office in Winchester?

No. There is no Hixtra office in Winchester or anywhere in Hampshire. The 01962 number rings through to the laboratory in Milton Keynes and every team travels from there. Coverage means we attend. It does not mean staff, vehicles or kit are kept locally. Samples for laboratory CBR travel back to the laboratory with the team.

Hixtra in action

See the testing in practice.

Explore our films →
In-situ CBR testing — Hixtra's original filmWatch the film

In-situ CBR testing

See how bearing strength is tested directly on site.

Plate bearing testing — Hixtra's original filmWatch the film

Plate bearing testing

Watch a plate bearing test being carried out on prepared ground.

Soaked laboratory CBR testing — Hixtra's original filmWatch the film

Soaked laboratory CBR testing

Follow the laboratory process used to assess a prepared soil specimen.

In our customers’ words

A reputation built
on the work we do.

Trustpilot 4.8 / 5 ↑

Independent feedback from the people we work with.

★★★★★

Lee ChippingtonTrustpilot · September 2026

Read the full review →
★★★★★

terry heatherTrustpilot · August 2026

Read the full review →